3/4 inch 7 tonnes Yoke Alloy Wide Body Bolt Type Shackles

Home » Rigging Hardware » Wide Body Shackles » Bolt Type » 3/4 inch 7 tonnes Yoke Alloy Wide Body Bolt Type Shackles

Product Description:

SHKL BODY WIDE YOKE 8-809-19 3/4"
7 TONNES YOKE WIDE BODY BOLT TYPE SHACKLE
  • Item #
    SKU:
    50WBS-G0070Y
  • Price (ea.)
    $67.79
  • Brand
  • Mfg. Model #
    8-809-19
  • Ship Weight (lbs.)
    3.7 lb
  • Availability Available in stock

Yoke 3/4 inch 7 tonnes 8-809-19 Forged Alloy Wide Body Bolt Type Shackle
 
Description
●Shackles are forged alloy steel with alloy pin. 
●Size and the Working Load Limit permanently shown on each shackle. 
●All shackles with Batch Code which links to Test Certificate and quality traceability. 
●100% magnaflux crack detection during manufacturing. 
●20,000 cycle fatigue rated to 1.5 times Working Load Limit. 
 
Dimensional Specifications:
Item No.

Nominal Size

Working Load Limit Dimensions (inch) N.W.
  inch tonnes* A B C D E G H K R W lbs

8-809-19

3/4 7 3.58 1.61 0.70 0.87 1.26 1.81 5.90 4.09 1.26 1.30 3.7

★ Minimum Ultimate Load is 5 times the Working Load Limit. Maximum Proof Load is 2 times the Working Load Limit. 
★ 8-809-19/-26 See Figure 1 

Made in Taiwan